3.5m 2500mm Large Scaffold
Our 3.5m 2500mm large scaffold is an extra-long mobile steel scaffold featuring a 2500mm span with 1167mm wide Large frames.
The longer 2.5m scaffold length provides a spacious working area and is particularly useful for jobs where the user needs to work along a wider section of wall, ceiling or building exterior before repositioning the scaffold.
With a maximum overall set-up height of approximately 3.5m, this model combines our Large 1167mm frame width with the longer 2500mm scaffold span.
Product Specifications
- Maximum overall set-up height: approx. 3.5m
- Scaffold span / length: 2500mm
- Frame width: 1167mm – Large
- Main frame height: 1941mm
- Guardrail height: approx. 1.0m
- Adjustable stem: 500mm
- Castor wheel: 200mm
- Approx. height adjustment: 300mm
- Material: Galvanised steel
- Configuration: Mobile scaffold
- Frame size: Large
What’s Included
- Ladder frames (1941 x 1167mm) x 2
- Platform solid plank (2500 x 505mm) x 1
- Diagonal brace bar (2800mm) x 2 pair
- Handrial x 1 set
- 600mm adjustable base plate x 4
- 6 inch lockable wheel x 4
Extra-Long 2500mm Scaffold Span
The key feature of the 3.5m 2500mm large scaffold is its longer 2.5m span.
Compared with our 1800mm scaffold models, the additional length provides a larger working area and allows the user to cover more horizontal distance before the scaffold needs to be repositioned.
This makes the 2500mm configuration particularly practical for:
- Exterior and interior painting
- Long wall sections
- Ceiling work
- Building renovation
- Cladding and finishing work
- Property maintenance
- General trade applications
1167mm Large Frames
This model uses our 1167mm Large scaffold frames, providing a generous scaffold width together with the longer 2500mm span.
The combination of 2500mm length + 1167mm Large frames creates a spacious scaffold configuration for customers who prioritise working area.
This is different from our Narrow and Medium scaffold ranges, which use narrower frame widths.
Mobile Scaffold Design
Lockable castor wheels allow the scaffold to be repositioned around the work area when required.
Before use, ensure the scaffold is correctly positioned and all castor wheels are securely locked. Never move the scaffold while it is occupied.
The adjustable stems provide height adjustment within the limits of the supplied components.
Galvanised Steel Construction
The scaffold is manufactured from galvanised steel for durability and repeated use.
Before each use, check that the frames, braces, platforms, guardrails, wheels and all required components are correctly installed and secured.
Always assemble and use the scaffold according to the supplied instructions.
Safety & Setup
The appropriate scaffold setup depends on the platform height, working environment and intended application.
For workplace use and higher scaffold configurations, additional access, guardrail, stabilising or other safety components may be required.
If you are unsure which configuration is suitable for your job, contact us before ordering.
Explore Our 2500mm Large Scaffold Range
Need a different height?
Browse our 2500mm Large Scaffold range to compare other heights using the same 2500mm span and 1167mm Large frame configuration.
Freight & Pickup
The listed product price does not include freight.
Nationwide delivery is available, with freight calculated according to your destination and order size. We can quote delivery to your address or, where available, to your nearest Mainfreight depot for collection.
Use the GET A FREIGHT QUOTE button to send us your delivery details.
Pickup may also be available from our Auckland or Christchurch stock locations, subject to stock availability.


